﻿id	summary	reporter	owner	description	type	status	priority	milestone	component	version	resolution	keywords	cc
11	ISOLTS misses test opportunity	anonymous	Eric Swenson	"The ISOLTS process includes instructing the operator to ""depress the initialize and clear push button"", but fails to verify that memory was actually cleared.

Failure of the operator is clear memory will result in incorrect test behavior, so it is reasonable for ISOLTS to verify that memory was cleared.

Failure of memory being cleared if the button was pressed would be indicative of a configuration or hardware failure, so it is reasonable that ISOLTS verify that was memory was cleared when the opportunity presents itself.

Before loading the PFT tests into the test segment, ISOLTS should check that the test segment is indeed set to all zeros, and if not, report that memory was not zero, indicating operator error, CPU malfunction or SCU malfunction.

Additionally, it should zero the memory before proceeding with the tests.

"	enhancement	new	major		Documentation				
